Project Overview:

Between 2011 and 2014, Asateen Group collaborated with the Ministry of Electricity on a comprehensive project aimed at enhancing the infrastructure of the Thermal Cycle Electricity Station. The project encompassed a range of critical components, including the strategic supply of high-pressure current transformers (33 - 132), specialized engines, and protection devices. Additionally, civil works and rehabilitation of sheds were undertaken, and various types of wires, high-pressure poles, current transformers, and air separators were supplied. The project also included the supply of NYNAS type transformer oils.


Key Components:

1. High-Pressure Current Transformers Supply:

- Asateen Group facilitated the strategic supply of high-pressure current transformers with specifications ranging from 33 to 132, contributing to the efficient operation of the Thermal Cycle Electricity Station.


2. Specialized Engines Supply:

- The project included the supply of specialized engines, designed to meet the specific operational requirements of the electricity station.


3. Protection Devices Supply:

- Asateen Group played a key role in the supply of protection devices, enhancing the safety and reliability of the electricity station's infrastructure.


4. Civil Works and Shed Rehabilitation:

- The project encompassed civil works and the rehabilitation of sheds, contributing to the overall improvement of the station's infrastructure.


5. Supply of Various Types of Wires, Poles, Transformers, and Air Separators:

- Asateen Group facilitated the supply of a diverse range of infrastructure components, including wires, high-pressure poles, current transformers, and air separators, ensuring a comprehensive enhancement of the station's capabilities.


6. NYNAS Type Transformer Oils Supply:

- The project involved the supply of NYNAS type transformer oils, contributing to the optimal functioning and maintenance of transformers within the station.


Project Duration:

The project spanned from 2011 to 2014.


Project Impact:

The collaborative efforts between the Ministry of Electricity and Asateen Group significantly enhanced the capabilities and resilience of the Thermal Cycle Electricity Station. The comprehensive supply of critical components and infrastructure improvements aimed to create a more reliable and efficient electricity generation facility.


Conclusion:

The commitment of Asateen Group, in collaboration with the Ministry of Electricity between 2011 and 2014, reflects a dedication to comprehensive infrastructure enhancement. By addressing key components and undertaking rehabilitation works, the project aimed to create a lasting positive impact on the operational efficiency of the Thermal Cycle Electricity Station.

 
 
 